INSTALLATION LOCATION
We recommend that this air conditioner be installed properly by qualified installation
technicians in accordance with the Installation Instructions provided with the unit.
Before installation, check that the voltage of the electric supply in your home or office is the
same as the voltage shown on the nameplate.
ELECTRICAL REQUIREMENTS
1. All wiring must conform to the local electrical codes. Consult your dealer or a qualified
electrician for details.
2. Each unit must be properly grounded with a ground (or earth) wire or through the supply
wiring.
3. Wiring must be done by a qualified electrician.
The wires in this mains lead are colored in accordance with the following code:
Green-and-Yellow: Earth
Blue: Neutral
Brown: Live
As the colors of the wires in the mains lead of this appliance may not correspond with the colored
markings identifying the terminals in your plugs, proceed as follows:
The wire which is colored green and yellow must be connected to the terminal in the plug which
is marked by the letter E or by the safety earth symbol or colored green or green-and-yellow.
The wire which is colored blue must be connected to the terminal which is marked with letter N or
colored black.
The wire which is colored brown must be connected to the terminal which is marked with the
letter L or colored red.
Do not install this air conditioner where there are fumes or flammable gases, or in an
extremely humid space such as a greenhouse.
Do not install the air conditioner where excessively high heat-generating objects
are placed.
Avoid: To protect the air conditioner from heavy corrosion, avoid installing the outdoor unit where
salty sea water can splash directly onto it or in sulphurous air near a spa.
To warm up the system, the power mains must be turned on
at least five (5) hours before operation. Leave the power
mains ON unless you will not be using this appliance for an
extended period.
Pull off the power plug from a receptacle, or switch off the breaker, or switch off the power
disconnecting mean to isolate the air conditioner from the main power supply when not in use
for a long time.
Power mains
ON
NOTE
01_F568247_EN.fm Page 3 Thursday, November 17, 2011 8:55 PM

Other manuals for Panasonic U-100PE1E5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Panasonic U-100PE1E5 and is the answer not in the manual?

Panasonic U-100PE1E5 Specifications

General IconGeneral
BrandPanasonic
ModelU-100PE1E5
CategoryAir Conditioner
LanguageEnglish

Related product manuals