EasyManuals Logo
Home>Quest Engineering>Dehumidifier>105 Dual

Quest Engineering 105 Dual User Manual

Quest Engineering 105 Dual
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
1-877-420-1330
Quest 105/155/205/ 225 Dual Installation, Operation and Maintenance Instructions
6
www.QuestHydro.com
info@QuestHydro.com
CAUTION! For proper drainage, the unit must be mounted so the drain outlet is at least 4”
above the floor drain, and must be fully supported under the base.
4.3 Condensate Water Removal
Condensate drains by gravity via the drain port. Use 3/4” male NPT PVC pipe. Route drain pipe to drain. Install a trap if
possible. Take care when installing drain pipe to drain port. Use an adjustable wrench to secure the drain port. An optional
condensate pump kit may be installed if a lift is required to dispose of the condensate. The condensate pump kit can be
ordered directly from the factory. See the optional parts list for information on the kit.
When installing the drain hose make sure the feet are extended such that the dehumidifier is 2 1/2” o the ground.
Then coil the drain hose under itself or position a spacer to lift the hose 1” o the ground after the hose has touched the
ground. This procedure will create a trap that ensures your unit drains correctly. See the diagram below for further visual
clarification.
4.4 Hanging Diagram
Bottom view of
unit and bracket
Bracket (4036668)
Opt.1 Opt.2

Other manuals for Quest Engineering 105 Dual

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Quest Engineering 105 Dual and is the answer not in the manual?

Quest Engineering 105 Dual Specifications

General IconGeneral
BrandQuest Engineering
Model105 Dual
CategoryDehumidifier
LanguageEnglish

Related product manuals