EasyManuals Logo

Rheem Stellar 850360 User Manual

Rheem Stellar 850360
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #31 background imageLoading...
Page #31 background image
CONNECTIONS PLUMBING
31
PIPE SIZES
To achieve true mains pressure operation, the cold water line to the water
heater should be the same size or bigger than the hot water line from the water
heater. The pipe sizing for hot water supply systems should be carried out by
persons competent to do so, choosing the most suitable pipe size for each
individual application. Reference to the technical specifications of the water
heater and local regulatory authority requirements must be made.
TEMPERATURE PRESSURE RELIEF VALVE
The temperature pressure relief valve is shipped behind the front cover. The
temperature pressure relief valve must be fitted before the water heater is
operated. Before fitting the relief valve, make sure the probe has not been bent.
Seal the thread with an approved thread sealant such as Teflon tape - never
hemp. Make sure the tape does not hang over the end of the thread.
Screw the valve into the correct opening (refer to the installation diagram on
page 28) leaving the valve drain pointing downwards. Do not use a wrench on
the valve body - use the spanner flats provided. A copper drain line must be
fitted to the temperature pressure relief valve (refer to "Relief Valve Drain" on
page 32).
The valve must be insulated with closed cell polymer insulation or similar
(minimum thickness 9 mm) and the insulation installed so as not to impede the
operation of the valve. The insulation must be weatherproof and UV resistant if
exposed.
EXPANSION CONTROL VALVE
Local regulations may make it mandatory to install an expansion control valve
(ECV) in the cold water line to the water heater. In other areas, an ECV is
required if the saturation index is greater than +0.4 (refer to “Water Supplies”
on page 13).
The expansion control valve must always be installed after the non-return valve
and be the last valve installed prior to the water heater (refer to diagram on
page 30). A copper drain line must be fitted to the expansion control valve
(refer to "Relief Valve Drain" on page 32).
The valve, if installed within 500 mm of the water heater, must be insulated with
closed cell polymer insulation or similar (minimum thickness 9 mm) and the
insulation installed so as not to impede the operation of the valve. The
insulation must be weatherproof and UV resistant if exposed.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rheem Stellar 850360 and is the answer not in the manual?

Rheem Stellar 850360 Specifications

General IconGeneral
BrandRheem
ModelStellar 850360
CategoryWater Heater
LanguageEnglish

Related product manuals