EasyManuals Logo
Home>Siemens>Switch>S3VA52T

Siemens S3VA52T User Manual

Siemens S3VA52T
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
s
Distribution Switchboard Section /
Power Panel Branch Mounting Kit
S3VA52T / S3VA52TD
for Type 3VA52 / 61 / 62 Breaker
Installation
Instructions
11-A-1168-01 Rev. 02
-4-
These instructions do not purport to cover all details or variations in equipment, or to provide for every possible contingency
to be met in connection with installation, operation or maintenance. Should further information be desired or should particular
problems arise, which are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the local
Siemens sales office. The contents of this Instruction manual shall not become part of or modify any prior or existing
agreement, commitment or relationship. The sales contract contains the entire obligation of Siemens. The warranty
contained in the contract between the parties is the sole warranty of Siemens. Any statements contained herein do not
create new warranties or modify the existing warranty.
Trademarks - Unless otherwise noted, all names identified by ® are registered trademarks of Siemens AG or Siemens
Industry, Inc. The remaining trademarks in this publication may be trademarks whose use by third parties for their own
purposes could violate the rights of the owner.
12a.
Orient the breaker such that the “ON”-side (with Bus
Extensions, part of Item 15) fits into the Top Barrier
(Item 4) and the “OFF”-side nestles between the
two fins on the Breaker Mounting Bracket (Item 5).
INSTALLING THE BREAKER:
12b. Fasten the breaker to the Breaker Mounting Bracket
(Item 5) with two #8-32 screws (part of Item 15).
(NOTE: Some breakers are packaged with a pair
of Breaker-Mounting Screws. If this occurs, dispose
of the pair that shipped with the breaker and use the
pair from this kit.)
12c. Align the Bus Extension (part of Item 15) holes with
the holes in the Straps (Items 1, 2 and 3) and fasten
with one 5/16”-18 screw (part of Item 15) per phase.
12d. If installing two breakers in the same unit space,
repeat the three steps above.
15
Figure 13
15
12e. Keeping components aligned, tighten all screws to
the torque values specified on the back of the
deadfront (or the table on Page 2).
INSTALLING THE NEUTRALS:
13a. If this kit is installed in a panelboard with a neutral,
install the Branch Neutral Lug Assembly (Item 13).
Locate on the Branch Neutral at either the top or
bottom of the Z-rails. Lug can be mounted on either
side of the Branch Neutral, depending on cable feed
location.
13b. If this kit is installed in a switchboard with a neutral,
install the Branch Neutral Lug Assembly (Item 14).
It can be mounted as shown or on any available
hole of the branch neutral, depending on cable feed
location.
13
Figure 14
13c. Keeping components aligned, tighten all screws to
the torque values specified on the back of the
deadfront (or the table on Page 2).
DEADFRONT PREPARATION:
14a. If a provision is in place, install the Provision Filler
Assembly (Item 16) in the appropriate Cover Plate
(Item 6) opening. Place a screw into each of the two
corner square holes and locate the filler plate onto
the front of the Cover Plate, with the label facing out.
Then, fasten two lock nuts onto the screws from the
rear of the Cover Plate.
10
Figure 16
6
11
16
7
14b. Position the Cover Plate (Item 6) over the five inch
unit space and fasten with four 1/4”-20 screws
(Item 7) onto the deadfront rails, one at each corner.
14c. Mark the I.D. cards (Item 11) as desired and place
onto the rear of Card Holder (Item 10), with the
marking facing out. Attach this subassembly to the
Cover Plate (Item 6) by aligning and pushing the
pins into the appropriate pair of holes in the Cover
Plate (Item 6).
FINAL PREPARATION:
15. Before energizing the equipment, ensure that
the deadfront, barriers and fillers are in place and
secure, and that all the covers are properly installed.
Hardware Key: (based on what is included in this kit)
Item numbers reference table on pg. 2
Item # 7
Item # 8
Item # 9 (reference instruction sheet 11-B-1009-01)
This instruction sheet can also be used as reference for
these two Panel Builder kits: KS3VA52T & KS3VA52TD
These two kits will ship with all the same components as kits
S3VA52T & S3VA52TD except for:
nut keepers & provision filler plate assemblies
Additionally, when installing a factory-installed provision,
nut keepers must be purchased with the breaker
NOTE: Provision Filler Assembly (Item 16) not a
component of kits KS3VA52T or KS3VA52TD. Skip 14a.
Figure 15
14
*
*
Nut keepers must be purchased with the breaker. Order options are:
for 3VA52 breakers: 3VA9233-0QA00 (kit of 3)
for 3VA61/62 breakers: 3VA9243-0QA00 (kit of 3)
or factory-installed on the breaker by using a “2” as the 12th
character in the breaker order: ( Ex.: 3VA61405HL320AA0 )
For factory-installed provisions, verify that the strap kit contains
bus extensions. (See Figure 12 on page 3 for reference.)
If bus extensions are not included, kit S3VA52PR is required,
one kit per breaker. Consult Siemens for more details.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens S3VA52T and is the answer not in the manual?

Siemens S3VA52T Specifications

General IconGeneral
BrandSiemens
ModelS3VA52T
CategorySwitch
LanguageEnglish

Related product manuals