If the voltage is out of the scope, inform to the factory worker for correcting the problem of voltage.
Install general AVR(Automatic Voltage Controller or UPS (Uninterruptible Power Supply)
1) Recommend to install the AVR , capacity 5KW above.
2) If the machines are too much ,which is connected to the AVR at the same time ,install the additional
supplies after checking the capacity of AVR.
※ If Sequin Device is already installed, use the compressor whose capacity is above 1Mpa.
After put out the Nob , set it by turning right or left for 0.6Mpa.
(Setting errors:±0.05Mpa)
After confirming the simultaneous algebraic connected equipment,
if capacity(Mpa) is not enough, build up additional.
3 Check and Adjust of levelness.
# Not for less then Y-Storke 850mm model
(1) Inspect outside of the machines and level the machine
※ When leveling by using water hose, check the air insertion in the middle of water hose, do not squeeze and
walk on it.
1) Levelness(L/R) : Installation must be under error scope 5mm
2) After checking that there are no debris on the base level ,install it with 2/100 error guage
(Based oh the center, left and right within three grid , left and right within 6/100 tolerances)
3) Check levelness of L/R, F/R
※ Do not put the Level Guage on the square pipes or table when leveling.
※ When leveling (L/R), check the variation of water from the hose,if it was changed, adjust it.
Check the all status of voltage (R,S),(S,T),(R,T).(operating voltage of the input voltage is +10% to -10% is fine)
Beam Body(left)
BeamBody(right)
Adjusting height with lifting
Asindicatedbynoted,
Levelinglevelitwitha
waterlevelL/R,F/R.
Asindicatedbynoted,
Levelinglevelitwitha
waterlevelL/R,F/R.
Page 3 Of 17 (주)SUNSTAR SWF CS Center