EasyManuals Logo
Home>Tenda>Network Router>S108

Tenda S108 User Manual

Tenda S108
9 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
4
LED Color Status Description
Power
Green ON
This indicator lights when the
Switch powers on.
OFF
If this indicator is not lighting,
please check the DC power
connector to ensure the correct
connection of the power adapter.
Link/Act
Green ON
The other devices connect to the
port of the Switch.
Green Blinking
The port is transmit- ting or
receiving data packets.
2. Installation
2.1 Before Connecting to the Network
Before connecting the S105/S108 to the network, please pay attention to
the following instructions:
Don’t put heavy articles on the Switch.
Power sockets and equipments should be within 1.5 meters of the
Switch.
Check power supply to confirm the safe connection.
Make sure there’s adequate space for proper heat dissipation and
adequate ventilation around the Switch.
2.2 Connecting to End Nodes
Use standard Ethernet cable to connect the Switch to end nodes as
described below. Switch ports will automatically adjust to the characteristics
(MDI-II/MDI-X, speed, duplex) of the device to which is connected.

Other manuals for Tenda S108

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tenda S108 and is the answer not in the manual?

Tenda S108 Specifications

General IconGeneral
BrandTenda
ModelS108
CategoryNetwork Router
LanguageEnglish

Related product manuals