EasyManuals Logo
Home>Terex>Industrial Equipment>RL4000D2 Series

Terex RL4000D2 Series User Manual

Terex RL4000D2 Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
November 2006
1
6
R
L
4
0
0
0
L
i
g
h
t
T
o
w
e
r
P
a
r
t
N
o
.
8
3
3
0
0
5
R
e
v
A
OPERATING INSTRUCTIONS
STARTING THE ENGINE/GENERATOR SET
Insure
the light switches are turne
d
off
. T
his preve
nts the
engine from startin
g under load and preve
nts electrical
equipment from
being damage
d.
1.
Unloc
k and ope
n the acc
ess doo
rs.
2.
Check t
he oil, fue
l, and cool
ant lev
els.
3.
Chec
k that the tow
er has been pro
perly gro
unded.
4.
Prehe
at the un
it for 1
0-30 se
conds
.
ver preheat for m
ore than 30 se
con
ds, damage may be
done to
the hea
ting
ele
ments.
5.
Turn the swi
tch towards the start s
ide of the switch. On most unit
s this is
towards the right.
T
o avoid s
tart damage, ne
ver operate the starter fo
r mor
e
than 45 seconds.
5.
St
art the engine and l
isten for any unus
ual sounds or vibrat
ions. Should unusual sounds
be detected,
contact T
erex Light
Construction Service Manager.
6.
Once the engine has been st
arted and running smoothly
, place the light switc
hes in the
“ON” positions,
one at a
tim
e
.
7.
Chec
k each flood lig
ht for proper ope
ratio
n.
8.
Clos
e and latc
h the acc
ess doo
rs.
V
aporous l
ights r
equire a wa
rm u
p period
of 5-1
0 minutes
before
they will produce a full
output.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Terex RL4000D2 Series and is the answer not in the manual?

Terex RL4000D2 Series Specifications

General IconGeneral
BrandTerex
ModelRL4000D2 Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals