Installation checklist
INSTALLATION CHECKLIST
RAUL Trane Air Cooled Condensing Unit
This list must be checked off by the installer to ensure correct installation before the unit starts up.
Unit acceptance
Check for damage, if any, on transportation
Check for equipment shipped against delivery slip
Check lifting system
Unit positioning
Remove packaging
Check position of unit
Check unit is level
Check clearance around condenser
Check clearance required for maintenance access
Check position of rubber pads
Refrigerant circuit
Check filter dryer and sight glass presence
Check oil traps presence on discharge line (if there vertical risers>3m)
Check pitch for horizontal lines (1cm/m)
Check refrigerant presence
Electrical equipment
Check direction of rotation of compressors and fan motors
Check installation and rating of mains power switch/fuse
Check that electrical connections comply with specification
Check that electrical connections match information on manufacturer’s identification plate
Check electrical connections and connections to mains power switch
General
Check available cooling charge (50% of rated installation load)
Check with other trades handling installation works
Comments: ...................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
Signature: ............................................................Name ............................................................................................................
Order N° ......................................................................................................................................................................................
Work site: ....................................................................................................................................................................................
Please return to your local Trane Service Office.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane RAUL 190 and is the answer not in the manual?

Trane RAUL 190 Specifications

General IconGeneral
BrandTrane
ModelRAUL 190
CategoryHeat Pump
LanguageEnglish

Related product manuals