EasyManuals Logo
Home>Trane>Furnace>TUX2B060A9362A

Trane TUX2B060A9362A User Manual

Trane TUX2B060A9362A
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
6 18-CD19D8-18
Installer’s Guide
DOWNFLOW INSTALLATIONS
UPFLOW
FURNACE
CASED
COIL
SCREWS
(BOTH SIDES)
STANDOFFS
(BOTH SIDES)
STANDOFFS (4)
DRILL SCREWS (4)
FOR VERTICAL
WARNING
!
Do not install the furnace directly on carpeting, tile or other
combustible material other than wood flooring. For
vertical downflow application, subbase (BAYBASE205)
must be used between the furnace and combustible
flooring. When the downflow furnace is installed vertically
with a cased coil, a subbase is not required.
UPFLOW INSTALLATION
Standoffs and screws (See Figure 1) are included with the
cased coils for attachment to the furnace. There are clear-
ance alignment holes near the bottom of the coil wrapper.
Drill screws are used to engage the furnace top flanges. The
standoff is inserted into the cabinet alignment hole. The drill
screws are inserted through the standoffs then screwed into
the furnace flange. The coil is always placed downstream of
the furnace airflow.
5
TABLE 1
CABINET
WIDTH
RETURN
DUCT WIDTH
FLOOR OPENING PLENUM OPENING
"A" "B" "C" "D"
14-1/2" 13-1/4" 13-5/8" 20-1/8" 12-5/8" 19-3/8"
17-1/2" 16-1/4" 16-5/8" 20-1/8" 15-5/8" 19-3/8"
21" 19-3/4" 20-1/8" 20-1/8" 19-1/8" 19-3/8"
24-1/2" 23-1/4" 23-5/8" 20-1/8" 22-5/8" 19-3/8"
HORIZONTAL INSTALLATION
The coil and furnace must be fully supported when used in
the horizontal position. It is always recommended that an
auxiliary drain pan be installed under a horizontally in-
stalled evaporator coil or 90% gas furnace. Connect the
auxiliary drain line to a separate drain line (no trap is
needed in this line).
Three brackets (with screws) are included with downflow
furnaces for installation to stabilize and secure the furnace
and TXC cased coil in the horizontal position. See Fig-
ure 4.
2
Required floor opening: (DOWNFLOW)
See Figure 3 and Table 1
1
123456789012345678901234567890121234567890123456
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
1
2345678901234567890123456789012123456789012345
6
123456789012345678901234567890121234567890123456
FURNACE
FRONT
A (width)
B (depth)
C
D
3
UPFLOW/
HORIZONTAL
SHOWN WITH
DIRECT VENT
IMPORTANT:
The 2/4TXC cased coil must be placed downstream of the
furnace. In horizontal installations, the apex of the coil
may point either toward or away from the furnace. See
the 2/4TXC coil Installer's Guide for more details.
The cased coil is secured to the furnace and both the furnace
and the cased coil must be properly supported. The brackets
mount using the rear screws on the coil case and use the
screws provided to secure the bracket to the furnace. The
remaining bracket is placed as close to center as possible
(horizontally) between the coil case front and the furnace
bottom channel (for downflow/horizontal furnace). Use four of
the screws provided to secure the bracket. The upflow furnace,
converted to horizontal, aligns and attaches the TXC coil as in
Figure 1. However, the coil requires additional support.
The furnace may be installed in an attic or crawl space in the
horizontal position by placing the furnace on the left side (as
viewed from the front in the vertical position). The horizontal
furnace installation in an attic should be on a service plat-
form large enough to allow for proper clearances on all sides
and service access to the front of the furnace (See Figure 5 &
Clearance Tables, pages 4-5). Line contact is only permis-
sible between lines formed by intersections of the top and two
sides of the furnace casing and building joists, studs, or
framing.
The furnace may be placed horizontally in a crawl space on a
pad or other noncombustible material which will raise the
unit for sufficient protection from moisture.
DOWNFLOW ONLY
4
CASED COIL CONNECTION
BRACKET FOR DOWNFLOW
FURNACE IN HORIZONTAL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane TUX2B060A9362A and is the answer not in the manual?

Trane TUX2B060A9362A Specifications

General IconGeneral
BrandTrane
ModelTUX2B060A9362A
CategoryFurnace
LanguageEnglish

Related product manuals