EasyManuals Logo
Home>TSM>Monitor>Optimix

TSM Optimix User Manual

Default Icon
4 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TSM Control Systems,
Ard Easmuinn,
Dundalk, Co. Louth, Ireland
Tel: (+353) 42-9335560 Fax: (+353) 42-9334422
Email: info@tsm-controls.com
Website: www.tsm-controls.com
Initial Setup Starting the Blender
The following sequence should be completed on initial power up of the
blender.
1. Power up
Connect mains power lead. (Please
read the safety information in the
introduction section for warnings
and the maintenance section
page26-29 for the electrical
connections)
Check that the operator display is
showing the home screen
The TSM blender range are
designed to allow easy operation
for operators of all nationalities.
The system operation therefor
uses internationallly recognised
symbols.See user manual for
symbol descriptions
Home screen
System Menu
Touching the home icon allows the user to return to the
home screen from any screen
Doc no TD 107 Rev 1.1
Page 1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TSM Optimix and is the answer not in the manual?

TSM Optimix Specifications

General IconGeneral
BrandTSM
ModelOptimix
CategoryMonitor
LanguageEnglish