EasyManuals Logo
Home>Wacker Neuson>Construction Equipment>BS50-2

Wacker Neuson BS50-2 User Manual

Wacker Neuson BS50-2
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
wc_tx003552gb_FM10.fm
39
Rammer
Operation
4.5 Purging the Oil Lines
For rammers with oil injection
(BS 50-2i, BS 60-2i, BS 70-2i)
If the rammer has a fuel tank (a) and an
oil tank (b), it has oil injection. The oil
lines may need purging.
When
As needed: when air bubbles are visible in the oil supply line or discharge line
Requirements
Machine is stopped
Engine is cool to the touch
Oil tank is filled
Fresh oil (as specified in Technical Data)
Phillips screwdriver
Plastic syringe
Clean, dry, absorbent cloth or paper towels
Purging the
oil supply line
Perform the procedure below to purge the oil supply line.
1. Locate the oil supply line (x) connected to the oil pump (y).
2. Loosen (open), but do not remove, the bleed screw (z). Gravity in the oil supply
line will purge trapped air.
3. When air bubbles are no longer visible in the oil supply line, retighten the bleed
screw.
4. Wipe residual oil from the supply line and oil pump.
This procedure continues on the next page.
wc_gr010452
a
b
wc_gr011479
x
z
y

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson BS50-2 and is the answer not in the manual?

Wacker Neuson BS50-2 Specifications

General IconGeneral
BrandWacker Neuson
ModelBS50-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals