EasyManuals Logo
Home>Zephyr>Ventilation Hood>AK9358BS

Zephyr AK9358BS User Manual

Zephyr AK9358BS
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #16 background imageLoading...
Page #16 background image
16
Monsoon II Use, Care, and Installation Guide
MONSOON II
INSERT
PRO
Installation Instructions
Electrical Supply
Electrical wiring must be done by qualified person(s) in
accordance with all applicable codes and standards. Turn o
electrical power at service entrance before wiring.
WARNING
For personal safety, remove house fuse or open circuit breaker before beginning installation. Do not
use extension cord or adapter plug with this appliance.
Follow national electrical codes or prevailing local codes and ordinances.
This appliance requires a 120V 60Hz electrical supply, and connected to an individual, properly
grounded branch circuit, protected by a 15 or 20 ampere circuit breaker or time delay fuse. Wiring
must be 2 wire w/ ground. Please also refer to the Electrical Diagram labeled on product.
Cable Lock
A cable locking connector (not supplied) might be required by local codes. Check with local
requirements and codes, purchase and install appropriate connector if necessary. (FIG. A)
Cable Lock
FIG. A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr AK9358BS and is the answer not in the manual?

Zephyr AK9358BS Specifications

General IconGeneral
BrandZephyr
ModelAK9358BS
CategoryVentilation Hood
LanguageEnglish

Related product manuals