EasyManuals Logo
Home>Zephyr>Ventilation Hood>ALL-M90BBX

Zephyr ALL-M90BBX User Manual

Zephyr ALL-M90BBX
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
- 18 -
FIG.14
INTERNAL BLOWER WIRING
Note: This range hood must be properly
grounded. The unit should be installed by a
qualified electrician in accordance with all
applicable national and local electrical
codes.
1. Secure capacitor box screwing the (2)
3.9x9.5 mm screws (Fig.13A)
2. Make connections (B,C, D) (Fig.13).
3. Remove the wiring box cover. Remove a
knockout from the wiring box (Fig.14E).
4. Secure the conduit to the wiring box
through a conduit connector.
5. Make electrical connections. Connect white
to white, black to black and green to ground.
6. Replace wiring box cover and screws.
Make sure that wires are not pinched
between cover and box.
WIRING BOX
COVER
FIG.13
A
E
D
B
C
MOUNTING SCREWS
3.9x6mm
GROUND

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr ALL-M90BBX and is the answer not in the manual?

Zephyr ALL-M90BBX Specifications

General IconGeneral
BrandZephyr
ModelALL-M90BBX
CategoryVentilation Hood
LanguageEnglish

Related product manuals