EasyManuals Logo
Home>Zephyr>Ventilation Hood>Monsoon I

Zephyr Monsoon I User Manual

Zephyr Monsoon I
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
34
Monsoon I Use, Care, and Installation Guide
MONSOON I
INSERT
CORE
ACT™ Conversion
Enabling ACT™
To enable ACT™:
1. Before hood installation, gain access to PC board by following the steps shown on FIG. J.
2. Change plastic jumper positioning as shown in FIG. K to set the desired maximum blower CFM.
3. Re-install PC board and continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the
hood body below the wiring diagram or in another clearly visible location.
To verify if your installer enabled ACT™:
1. Model AK9228BS & AK9234BS: With hood o, press and hold the power button for three seconds.
If the number 6 displays = default max. CFM, if the number 3 displays = max. 390 CFM, and if the
number 2 displays = max. 290 CFM.
Model AK9240BS & AK9246BS: With hood o, press and hold the power button for three seconds.
If the number 6 displays = default max. CFM, if the number 3 displays = max. 590 CFM, and if the
number 2 displays = max. 390 CFM.
2. When ACT™ is enabled, the number of blower speeds will be reduced as follows:
AK9228BS & AK9234BS: 390 CFM = max. 3 speeds and 290 CFM = max. 2 speeds.
AK9240BS & AK9246BS: 590 CFM = max. 3 speeds and 390 CFM = max. 2 speeds.
3. There should also be a foil label located inside the hood body near the wiring diagram that
indicates the blower CFM.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr Monsoon I and is the answer not in the manual?

Zephyr Monsoon I Specifications

General IconGeneral
BrandZephyr
ModelMonsoon I
CategoryVentilation Hood
LanguageEnglish

Related product manuals