9
1. Measure from range top to hood bottom and mark line A.
´PLQLPXPIURPUDQJHWRS
2. Plum and mark center line.
 0DUNPRXQWLQJKHLJKWOLQH%´IURPOLQH$
4. Mark mounting spread from C/L on line B. From center line
WROHIWPRXQWPDUN´)URPFHQWHUOLQHWRULJKWPRXQW
PDUN´
 )DVWHQ0[´VFUHZVLQWRVWXGVRQOLQH%'RQRW
fasten screws all the way. Note: wood blocking may need
to be added behind the drywall if no studs are present.
Wall anchors may also be used but check local codes
for compliance. Failure to use suitable wall anchors
and screws to hold the weight of the hood could result
in personal injury or damage to cooking surface or
counter.
 +DQJKRRGRQWRVFUHZVDQGKDQGWLJKWHQ),*$8VH
the last M6 x 1-1/4” screw to further secure the hood to the
wall from inside the hood.
7. Center and attach duct cover bracket to wall below ceiling
RUVRI¿WXVLQJ0[´VFUHZV
8. Remove tape securing electronics mounting bracket to
hood. Reposition electronics mounting bracket to hood and
VHFXUHE\WZRSUHLQVWDOOHGVFUHZVDVVKRZQLQ),*%
9. Install electrical.
10. *Install duct work and duct tape.
11. Power up hood and check for leaks around duct tape.
12. Place telescopic duct covers onto hood and extend inner
WRSGXFWFRYHUXSZDUGVDQGVHFXUHWRGXFWFRYHUEUDFNHW
XVLQJ0[´VFUHZV
*If using hood in recirculating mode you must secure air
diverter plate onto wall before installing duct work and duct
covers. Turn to page10 for more details.
A
B
C/L
10-1/4"
3-9/16"
C/L
26" min
1
Duct Cover Bracket
4-3/4"
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Installation – Mounting the Hood
Cable Lock
1
Cable Lock
$FDEOHORFNLQJFRQQHFWRUQRWVXSSOLHGPLJKW
be required by local codes. Check with local
requirements and codes, purchase and install
appropriate connector if necessary.
FIG. A
FIG. B

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Zephyr Venezia ZVE-E30BS and is the answer not in the manual?

Zephyr Venezia ZVE-E30BS Specifications

General IconGeneral
BrandZephyr
ModelVenezia ZVE-E30BS
CategoryVentilation Hood
LanguageEnglish

Related product manuals