Do you have a question about the Zurn Wilkins 375 and is the answer not in the manual?
Important safety warnings and precautions for installing the Model 375.
Steps for flushing, providing access space, and ensuring proper installation.
Guidelines for providing adequate drainage and air gaps for relief valve discharge.
Requirements for installing the device outdoors, focusing on freeze protection.
Preference for indoor installation in freezing conditions and basic instruction applicability.
Guidelines for connecting two or more devices in parallel for uninterrupted service.
Steps for slowly opening shut-off valves to pressurize the backflow preventer.
Venting trapped air and opening the downstream shut-off valve to put the device in service.
Addressing spitting discharges and post-installation testing requirements.
Procedure to test the #2 check valve's tightness against reverse flow.
Procedure to test the #1 check valve's tightness and record pressure drop.
Procedure to test the differential relief valve's operation.
Requirements for inspection, maintenance frequency, and using genuine parts.
Detailed steps for disassembling, inspecting, and reassembling check valves.
Steps for disassembling, inspecting, and reassembling the relief valve.
Diagnosing and correcting sudden spitting or light intermittent drips.
Diagnosing and correcting continuous discharge from the relief valve.
Technical specifications including working pressure, temperature, and connections.
Steps to blow out the system for freeze protection, including fitting replacement.
Steps to flush the system during installation to remove debris.
Graphs and tables detailing relief valve discharge rates and repair kits.
Important safety warnings and precautions for installing the Model 375.
Steps for flushing, providing access space, and ensuring proper installation.
Guidelines for providing adequate drainage and air gaps for relief valve discharge.
Requirements for installing the device outdoors, focusing on freeze protection.
Preference for indoor installation in freezing conditions and basic instruction applicability.
Guidelines for connecting two or more devices in parallel for uninterrupted service.
Steps for slowly opening shut-off valves to pressurize the backflow preventer.
Venting trapped air and opening the downstream shut-off valve to put the device in service.
Addressing spitting discharges and post-installation testing requirements.
Procedure to test the #2 check valve's tightness against reverse flow.
Procedure to test the #1 check valve's tightness and record pressure drop.
Procedure to test the differential relief valve's operation.
Requirements for inspection, maintenance frequency, and using genuine parts.
Detailed steps for disassembling, inspecting, and reassembling check valves.
Steps for disassembling, inspecting, and reassembling the relief valve.
Diagnosing and correcting sudden spitting or light intermittent drips.
Diagnosing and correcting continuous discharge from the relief valve.
Technical specifications including working pressure, temperature, and connections.
Steps to blow out the system for freeze protection, including fitting replacement.
Steps to flush the system during installation to remove debris.
Graphs and tables detailing relief valve discharge rates and repair kits.
| Brand | Zurn Wilkins |
|---|---|
| Model | 375 |
| Category | Control Unit |
| Language | English |
Loading...