OVR-15, 27 & 38 LV cabinet Instruction Manual
- LV cabinet should not be stacked one over the other.
- LV cabinet should be lifted by a lifting device equipped with forks or slings. If a crane is used, slings
shall be used. The units must not be rolled or dropped.
Figure-2 : Packing case lifting arrangement
3 RECEIPT AND STORAGE PRIOR TO INSTALLATION
RECEIPT OF RECLOSER
Each LV cabinet is assembled and tested at the factory. Prior to shipment, the equipment is thoroughly
inspected to ensure a quality product free from defects. If damage is noticed, call the carrier at once for
inspection, and request an inspection report. Afterwards, le a formal claim with the carrier, supported
with the Airway/Roadway Bill.
Each delivery, on receipt, should be checked for,
- Shortages and discrepancies. (Check against order and delivery documents).
- Any transit damage and material losses.
- Abnormality, if any, must be notified immediately to ABB, forwarding agents and the insurance
company.
Instructions and literature packed with the LV unit should be kept with the unit. Additional copies may
be obtained upon request from the local ABB sales office. Following are the typical parts in which
recloser are generally shipped from factory.

Other manuals for ABB OVR-15

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB OVR-15 and is the answer not in the manual?

ABB OVR-15 Specifications

General IconGeneral
BrandABB
ModelOVR-15
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals