2.1 Condition on delivery
Delivery packing
2.2 Unpacking at installation site
Storage and inspection
NOTE
Any transport damage must be reported to the
carrier/forwarder immediately. If installation of
the switchgear is to be made immediately after
delivery, the transport packing must be removed,
except for the plastic vapour corrosion inhibitor
film covering the units, which must only be
removed at the final switchgear installation site
Unpacking
Packing materials
Raw material Possible recycling method
Table 2. Packing materials
Figure 11. Fixing plates outside the 375-500 mm unit