PL V2 Series User Manual - 17 -
lower side of the power supply box to ensure that the power supply box will not be loose or
fall, the specific installation position is shown in the following figure.
*It’s neccessary to place order for screws when PL3.9W Plus V2(500*500mm cabinet), PL3.9 Pro V2
(500*500mm cabinet), PL4.8W Plus V2(500*500mm cabinet) , PL4.8 Pro V2(500*500mm cabinet)
used be floor tile. Each panel need lock 2Pcs screws on power box.
2、After installing the box and connecting the wires, use 12 M1.6*12mm screws to
install the acrylic board on each box.
*Constraint coverage structure around the whole screen is required to prevent the displacement of PC
mask during strong vibration. The load capacity is 2000KG/SQM.