EasyManuals Logo
Home>Airwell>Air Conditioner>GC 24

Airwell GC 24 User Manual

Airwell GC 24
105 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
11-1
TUBING CONNECTIONS
SM FLODCI 2-A.4 GB
11. TUBING CONNECTIONS
TUBE (Inch)
TORQUE (Nm)
¼” ⅜” ½” ⅝” ¾”
Flare Nuts 11-13 40-45 60-65 70-75 80-85
Valve Cap 13-20 13-20 18-25 18-25 40-50
Service Port Cap 11-13 11-13 11-13 11-13 11-13
1. Valve Protection Cap-end
2. Refrigerant Valve Port (use Allen wrench to open/close)
3. Valve Protection Cap
4. Refrigerant Valve
5. Service Port Cap
6. Flare Nut
7. Unit Back Side
8. Copper Tube
When the outdoor unit is installed above the indoor unit an oil trap is required every 5m along the suction
line at the lowest point of the riser. Incase the indoor unit is installed above the outdoor, no trap is
required.
CONTENTS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Airwell GC 24 and is the answer not in the manual?

Airwell GC 24 Specifications

General IconGeneral
BrandAirwell
ModelGC 24
CategoryAir Conditioner
LanguageEnglish

Related product manuals