Summary of Tubing Connections:
There are 4 connections: See Fig. 10 and 10A
Point A to X: Connect RO to COLD water supply — Red tubing.
Point G to Y: Connect product water from 5th -stage filters to tank — Yellow tubing. This tubing is a 2-way
line. Product water enters and leaves the tank via this same line.
Point H to Z: Connect product water from 5th-stage output to dispensing faucet — Clear tubing.
Pump “Brine Out” to W: Connect waste water from Pump’s “Brine Out” port to the drain outlet — Black tubing.
Fig 10
Fig 10A
3
free drinking water.com