Table of contents
3.1.2 Unpacking 13
3.2 Installation of the PC in the control cabinet 14
3.2.1 Preparation of the control cabinet 14
3.2.2 Earthing measures 14
3.3 Power supply of the Industrial PC 15
3.3.1 Beckhoff power supply technology 15
3.3.2 Fitting the cable 17
3.3.3 Connecting Power Supply 18
3.4 Connecting the Industrial PC 20
3.4.1 Connecting cables 20
3.4.2 Check voltage rating and connect 20
4 Operating Instructions 21
4.1 Switching the Industrial PC on and off 21
4.1.1 Switch on 21
4.1.2 Shutting down and switching off 21
4.1.3 First switching on and driver installation 21
4.2 Servicing and maintenance 22
4.2.1 Cleaning of the Industrial PC 22
4.2.2 Maintenance 22
4.2.3 Replacing the Battery on the Motherboard 22
4.3 Emergency procedures 22
4.4 Shutting down 22
4.4.1 Disposal 22
5 UPS Software Components (optional) 23
5.1 Installation on the PC 23
5.2 Help files 23
6 Troubleshooting 24
7 Assembly dimensions 25
8 Technical Data 31
9 Appendix 32
9.1 Beckhoff Support and Service 32
9.1.1 Beckhoff branches and partner companies 32
9.1.2 Beckhoff company headquarters 32
9.2 Approvals for USA and Canada 33
9.3 FCC Approvals for the United States of America 33
9.4 FCC Approval for Canada 33
2 C6920/ C6925