12
5. INSTALLATION
BeforeliftingthemainON/OFFswitch(3)lltherearwatertankunderthecupshelf
(11).
1)Removethecoeemachinefromitsparckingandcheckthatithasnotbeendamaged.
2) Place the appliance on a stable top, close to the mains sockets and water line connections. The
machine must be installed in a horizontal position. The inclination of the support surface must not
be greater than 1°. To ensure normal operation, the machine must be installed in places where the
ambient temperature is between +5°C and +32°C and humidity does not exceed 70%. Do not use
water jets or install in places where water jets are used. Check that the voltage of your mains supply
correspondstothatindicatedinthetechnicalspecications.
3) Remove the upper cover grid (11), take out the water
tank (located inside the machine) and rinse it (Photo 1).
4) Fill the tank with approx. 3 litres clean water, put it
back, connect the water softener and insert the small
silicone tubes. Close the upper cover grid (11) on the
machine.
5) Before start-up the tter must make sure the ma-
chine has been properly connected to the electrical and
earthingsystemsinvolvedand checkthe eciencyof
protection from direct contact.
In Europe connect the approved cord H05VV-F 3G 1.5 mm with the Schuko plug to the electricity
supply.
In USA-Canada connect the approved cord Type SJTO, rated 3x14 AWG, 300 V, 105°C with the
NEMA 5x15P plug to the electricity supply.
IT IS STRICTLY FORBIDDEN TO USE THE MACHINE WITHOUT EFFEC-
TIVE SAFE EARTHING.
5a. MACHINE WITH CONNECTION TO THE MAINS
WATER SUPPLY
If your machine is to be connected to the mains water supply call a specialized technician. Using the
suppliedtuboex(3/8”),thetechnicianwillconnectthemachinellingconnectortothesystemused
to treat water intended for human consumption (or potable) (not provided) (use only tubes suitable for
contact with water intended for human consumption in accordance with legislation in the country
where the product is used). A pressure reducer must be installed. Switch on the water softener and
check for any leaks.
6. MACHINE IGNITION
Before turning on the machine it is advisable that you check that there is water inside the
rear tank under the cup shelf (11).
1) Lift the ON/OFF power switch (3). The red indicator light (4) comes on.
2) When the machine is switched on, the electronic card checks water level inside the boiler. After
approx.3seconds,thellingpumpandsolenoidvalveareenabledforlling.
The coffee machine will automatically be filled with water up to the pre-set level (level probe inside
the boiler).
NB: The machines with internal tank quick coupling incorporate a safety system level. If the probe
doesnotdetectwaterintheboilerwithin180”,itstartsthesoundof abuzzerwithhighrepetition