Example:
start update CBC eeprom, offset = 0x0,length=1000
..............................................................
done update CBC eeprom
start update I2C eeprom
...............................................................
done update I2C eeprom
The power system programming change is complete. The system must now be completely powered
down, and the NEW power system hardware installed. When the system is rebooted the software
will recognize the new power system. Please power down the system at this point.
#
Step 6 Remove the old power module (see Removing a Version 1 AC or DC Power Module, on page 14 or Removing
a Version 2 or Version 3 AC or DC Power Module).
Use two hands to remove the power module. The power supply weighs about 6.5 pounds (2.95 kg).
Caution
Step 7 Install the new power module (see Installing a Version 1 AC or DC Power Module, on page 16 or Installing
a Version 2 or Version 3 AC or DC Power Module, on page 16).
To prevent damage to the power tray backplane connector, do not use excessive force when inserting
the power module into the power tray.
Caution
Step 8 Power up the chassis.
Step 9 Verify that the (green) Power Input indicator on the front of the power module goes on. If the indicator does
not light, see Troubleshooting the Power Subsystem .
Removing a Version 1 AC or DC Power Module
Follow these steps to remove a version 1 AC or DC power module from the power tray (figure below).
Procedure
Step 1 Push the door latch to the left to release the door.
Step 2 Pivot the door to the right to eject the power module from its bay.
Step 3 Slide the power module out of its bay while supporting it with your other hand.
Use two hands to remove the power module. The power supply weighs about 6.5 pounds (2.95 kg).
Caution
Replacing Cisco ASR 9000 Series Router Components
14
Replacing Cisco ASR 9000 Series Router Components
Removing a Version 1 AC or DC Power Module