7
Insert Installation
1. This installation is optimized for a 2x4 framed wall.
Prepare the framed opening according to the chart
on page 6. *Provide appropriate dedicated circuit for
hardwire install at the top right of framed opening.
2. Install L Metal Nailing Flanges to the replace.
3. Insert the re unit in the framed opening and install
with a minimum 1 ¼ drywall screws to secure the
unit.
4. The unit can be covered with a custom facade.
Decorate as desired.
7