EasyManuals Logo
Home>Delta>Plumbing Product>Monitor 14 Series

Delta Monitor 14 Series User Manual

Delta Monitor 14 Series
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
88741 Rev. D
Installation
1
Cartridge Installation
A. B.
Turn off water supplies.
Remove
cover (1), bonnet nut (2) and test cap (3)
from the body. If this is not a thin wall
mounting, the entire plasterguard (4)
may be removed. If screen (5) is in place,
remove before installing cartridge.
Rotate the cartridge (1) so the letter
“H” (2) appear on the left. Insert
cartridge into valve body as shown. Make
sure the cartridge tubes and O-rings (3)
are properly seated in holes at the base of
the body. Ensure the keys on the body are
fully engaged with the slots in the body (4).
Back to back Installation C.
For back to back or reverse installations
(hot on right and cold on left) insert the
cartridge with the “H” on the right.
If you are not making a reverse or back
to back installation skip this step and
continue with step 1C.
Slide bonnet nut (1) over the cartridge
and thread onto the body. Hand tighten
securely.
3
Normal Installation (changes not required)
Reverse
Installation
Cold
Hot
2
3
5
4
4
1
4
1
3
2
1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta Monitor 14 Series and is the answer not in the manual?

Delta Monitor 14 Series Specifications

General IconGeneral
BrandDelta
ModelMonitor 14 Series
CategoryPlumbing Product
LanguageEnglish

Related product manuals