Dometic BR342 Installation
EN 19
➤ Install return air vent grille into the air distribution box. Slide return air grille tab into slot in air distribution box and
rotate up and snap in place.
➤ The unit installation is now complete and is ready for operation. The power supply to the unit may now be turned on.
➤ Verify that all features of the installed system work. Please read the following operating instructions before attempting
to run the unit.
6 Operating instructions
6.1 Centre air discharge
The ADB is able to discharge the air directly down below the ADB by opening the slider shown below.