EasyManuals Logo
Home>Duplo>Binding Machine>DB-200

Duplo DB-200 Operation Manual

Duplo DB-200
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
3
Installation
Note: You must remove the three red shipping brackets before installing your DB-250.
The procedures for installation:
1. Remove the red shipping bracket located on the
left side of the clamp station as shown. Then
reinstall the screws in clamp station.
2. Remove two red shipping brackets that are
located around the nipping station as shown.
3. Lift up your DB-250, slide in the bottom cover
first. Then slide in the glue draining tray
underneath the glue tank as shown.
4. Place your DB-250 on a safe, firm and solid
table. Then mount the cover-sheet holder to the
right side of the machine as shown.
Note: (A) For Adjusting the Glue, Replenishing the Glue Tank, Nipping Pressure
Control or Glue Replacement, please refer to the operation procedure (F),
(G) and (H) for details.
(B) You also can change the factory settings of your DB-250 operation if
necessary. Note that we only recommend you to change TR1. For “SETUP FOR
TIMERS”, please refer to APPENDIX on page 14.

Other manuals for Duplo DB-200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Duplo DB-200 and is the answer not in the manual?

Duplo DB-200 Specifications

General IconGeneral
BrandDuplo
ModelDB-200
CategoryBinding Machine
LanguageEnglish

Related product manuals