COMMISSIONING
30/56
EN
5 COMMISSIONING
5.1 Safety during commissioning
CAUTION
It may be hazardous to assign activities to personnel that are not sufciently qualied. It may
harm the operators themselves if they perform manoeuvres or operations incorrectly, with a
serious impact on personal safety, things and property.
CAUTION
Installation, commissioning and maintenance activities must only be carried out by the personnel
of dedicated heating companies specically qualied to perform these tasks.
CAUTION
Hot surfaces - Risk of burns!
- Contact with components at high temperatures may cause more or less serious supercial
burns.
- Operators should wear suitable clothing and personal protective equipment.
- They should ensure that all components are at ambient temperature before carrying out any
maintenance operations.
FUEL LEAKS
- Fuel leaks may cause re to break out.
- They may be toxic via inhalation and cause skin irritation in some individuals.
- Act swiftly to remove the cause of the leak. If it is connected to a maintenance operation, use
suitable personal protective equipment.
5.2 Checks before commissioning
The following must be checked before initial commissioning:
That the burner is assembled in accordance with the instructions given here
That the burner is pre-set in accordance with the values in the adjustment table
Setting the combustion components
The boiler must be ready for operation, and the operating regulations for the heater must be
observed
All electrical connections must be correct
The boiler and heating system must be lled with water and the circulating pumps must be in
operation
The thermostats and any other safety or limiting devices that might be tted must be connected
and operational
The ue system must be unobstructed and the secondary air system, if available, must be
operational
An adequate supply of fresh air must be guaranteed
The heat request must be available
Fuel tanks must be full
The fuel supply lines must be assembled correctly, checked for leaks and bled
In the event the burner does not start on initial start-up following a long period of storage,
the pump should be checked to ensure it is not blocked. See chapter on “5.6.4 Check pump
rotation” on page 34
A standard-compliant measuring point and analyser test point must be available, the ue
system to the measuring point must be free of leaks to prevent anomalies in the measurement
results.
CAUTION
CAUTION
CAUTION

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the elco Firebird FB 4 R LN and is the answer not in the manual?

elco Firebird FB 4 R LN Specifications

General IconGeneral
Brandelco
ModelFirebird FB 4 R LN
CategoryBurner
LanguageEnglish

Related product manuals