75 YzIN,
(191.77 CM)
ROUGH-IN DIMENSIONS
54 5/16 IN.
(137.95 CM)
CONNECTION ©
WATERINLETS _ --
43 IN.
(109.22 CM)
(REAR)
._ DRAIN OUTLET
(REAR)
_J
3%1N.
_(9.52 CM)
27 IN.
(68.58CM)
16¼ IN.
(41.27 CM)
_GAS SUPPLY
PIPE(REAR)
5 I/4 IN, _
_(13.33 CM) /
43 IN.
11::
I (104.77 CM)
29 7/16 IN
(74.77CM)
25 ¼ IN.
(64.13 CM) --
47" --
\
36 1/161N.
(91.60 CM)
II
30 13/16 IN.
(78.26 CM)
2 YzIN.
(6.35 CM)
17/8 IN.
(4.76CM)
4 13/16 IN.
(12.22CM)
+
11 7/16 IN.
(29.5 CM)
UNPACKING
1. Using the four shipping carton corner posts (two on each
side), carefully lay the laundry center on its left side and
remove foam shipping base.
Excessive weight. Use two or more people
to move Laundry Center.
2. Using a ratchet with 3/8 inch (0.96 cm) socket, remove the
mechanism shipping bolt and plastic spacer block from the
center of the base.
NOTE: If the laundry center isto be transported at a later
date, the tub blocking pad, shipping bolt, and plastic
spacer block should be retained.
3. Return laundry center to an upright position.
PLASTIC SPAC ER
4. Remove:
(a) foam tub blocking pad.
(b) foam shipping blocks from rear of unit.
(c) tape from dryer door.
(d) foam dryer support pads.
(e) inlet hoses.
(f) enclosure package.
5. From the back of the washer, remove the wire shipping
clips securing the drain hose and power cord (if equipped).
Plastic clamps secure the drain hose to the right side of
the washer backsheet. These clamps form a standpipe to
prevent water syphoning. DO NOT REMOVE THESE
CLAMPS.
.
Carefully move the laundry center to within 4 feet (1.22 m)
of the final location to begin the installation.
MECHANIS
SHIPPING
BOLT
POSTS
FOAM
SHIPPING
PAD
(IF EQUIPPED)
DRAIN HOSE