25
BreakMaster Load Interrupter Switch
S
equence of Operation for Controller MX250-LIS
See GE Zenith document 71R-2000A for more details
When Normal Source voltage or frequency
falls below the preset “Fail” values
(P) Time Delay to start Emergency Source
Time Delay (DT) for closing Normal Switch
S2>S1, SOL Timer star
t
Time Delay (T) to confirm availability of stable
Normal Source (S1). S2>S1, SOL Timer start
Emergency Source Not Available
Nothing Happens. STOP!
Emergency Source Available
S1>S2, SOL timer starts
Normal Source (S1) Switch Open
No
No Yes
Emer
gency Swit
ch
stays as is. END!
Yes
Emergency Switch CloseIs Normal Source (S1) available?
Emergency Switch Open
Normal S
witch Close
When Normal Source returns
(W) Time Delay to open Normal Source to ensure voltage and frequency stabilization
of Emer
gency Source before transfers
Time Delay (DW) before closing Emergency Switch.
Is Emergency Source (S2) available?
Emergency Source Stop Delay Time (U) – Cool Down
Transfer to Normal
Source (S1)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE BreakMaster and is the answer not in the manual?

GE BreakMaster Specifications

General IconGeneral
BrandGE
ModelBreakMaster
CategorySwitch
LanguageEnglish

Related product manuals