3 HOMEDEPOT.COM/GLACIERBAY
Please contact 1-855-HD-GLACIER for further assistance.
Pre-Installation
PLANNING INSTALLATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package and hardware contents list. If any part
is missing or damaged, do not attempt to assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 15 minutes
Installation may vary depending on how the previous showerhead was installed. Supplies necessary for the installation of the showerhead
are not all included; however, they are available wherever plumbing supplies are sold.
Prior to beginning installation, turn off the hot or cold water lines, then turn on the old showerhead to release built-up pressure. When
installing the new showerhead, turn the connector nuts nger tight. Wrap all threaded connections with PTFE pipe tape. Always wrap in a
clockwise direction.
SPECIFICATIONS
Maximum ow rate: 1.8 GPM (6.81 LPM) at 80 PSI
cUPC, WaterSense
Brushed nickel and matte black nishes
TOOLS REQUIRED
Adjustable
wrench
Safety goggles
Channel-lock
pliers
Electric
drill
Phillips
screwdriver
HARDWARE INCLUDED
NOTE: Hardware not shown to actual size.
Part Description Quantity
AA Rubber washer 4
BB Mounting screw 2
CC Wall anchor 2
DD Thread seal tape 2
AA BB CC DD