EasyManuals Logo
Home>Gree>Air Conditioner>FP-51XD-E

Gree FP-51XD-E User Manual

Gree FP-51XD-E
18 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
Cassette Type Fan Coil Unit Owner's Manual
6
the air conditioner.
4.3 Important notice
(1) To guarantee the good performance, the FCU must be installed by professional personnel in
accordance with this instruction.
(2) Please contact the local Gree special nominated repair department before installation. Any
malfunction caused by the unit that is installed by the department that is not special nominated by
Gree would not deal with on time by the inconvenience of the business contact.
4.4 Dimension of ceiling opening and location of the hoisting screw
Fig.3 Installation Dimension Diagram
The drilling of holes in the ceiling must be done by the professional personnel.
(160)
Ceiling
Installation stands for main body of the unit
Above 20
Fig.4
Note:
The dimension for the ceiling openings with * marks can be as large as 910mm. But the
overlapping sections of the ceiling and the decorated surface boards should be maintained at no
less than 20mm.

Other manuals for Gree FP-51XD-E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree FP-51XD-E and is the answer not in the manual?

Gree FP-51XD-E Specifications

General IconGeneral
BrandGree
ModelFP-51XD-E
CategoryAir Conditioner
LanguageEnglish

Related product manuals