EasyManuals Logo
Home>Gree>Air Conditioner>GMV-ND22PLS/A-T

Gree GMV-ND22PLS/A-T User Manual

Gree GMV-ND22PLS/A-T
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #18 background imageLoading...
Page #18 background image
Multi Variable Air Conditioners Duct Type Indoor Uni
15
4.4 Installation of Air Duct
Notes:
There should be insulating layer on air-out duct, air-return duct and fresh air duct to avoid
heat loss and moisture. Adhere a nail on the air duct and then add thermal sponge with a layer of
tin. Fasten it with a nail cover and then seal the junction with tin tapes; You can also use other
materials that have good insulation quality.
Each air-out duct and air-return duct should be fixed on a pre-made board with iron frame.
The junction of air duct should be well-sealed in order to prevent air leakage.
The design and construction of air duct should comply with national requirements.
The edge of air-return duct is suggested to be more than 150mm away from the wall. Add
a filter to the air-return opening.
Please consider noise-damping and vibration damping for the design and construction of
air duct. Besides, noise source must be away from people. For instance, do not have the
air-return opening installed on top of the user(offices, rest area, etc.).
4.4.1 Installation of Air-out Duct
(1) Installation of the Rectangular Duct
Fig 4.4.1
No.
Name
No.
Name
1
Hanger Rod
5
Static Pressure Box
2
Return Air Duct
6
Filter Screen
3
Canvas Duct
7
Main Supply Air Duct
4
Return Air Inlet
8
Supply Air Outlet
(2) Installation of Circular Duct
Fig 4.4.2

Other manuals for Gree GMV-ND22PLS/A-T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-ND22PLS/A-T and is the answer not in the manual?

Gree GMV-ND22PLS/A-T Specifications

General IconGeneral
BrandGree
ModelGMV-ND22PLS/A-T
CategoryAir Conditioner
LanguageEnglish

Related product manuals