9. Examination After Installation
After finishing the installation, please conduct check and examination according to the
following sheet.
Contents for
Installation
1)Check if the installing place of outdoor unit has
good ventilation.
2)Check if the outdoor unit is firmly fixed and has
damping measures.
3)Check if the operating noise of outdoor unit will
influence the neighbors.
1)Check if the installing place of water tank has
enough weight capacity.
2)Check if the water tank is fixed reliably.
1)Check if the installation of water pipes are in
order.
2)Check if the water system is expedite without
blockage.
3)Check if the model of water pump is consistent
with the demand of delivery lift of flow and pipe.
4)Check if the back water pipes are set according
to requirement.
5)Check if the pipes have been conducted gas
proofness test.
1 ) Check if the heat insulating thickness is
consistent with the requirement.
2)Check if the heat insulation work of water pipes
are in good condition.
3 ) Check if the level of combustion for heat
insulation material is consistent with the
fireproofing requirements.
1)Check if the unit is adopting special power
source.
2)Check if the power cord and air switch have
satisfied the requirements of unit.
3)Check if the layout of wires is reasonable. Pipe
pass protection measures should be well arranged.
4)Check if the power cord and communication wire
are arranged separately.
5)Check if the power cord, communication wire,
earth wire are correctly connected according to the
circuit diagram.
6)Check if the installation and place of water level
switch is consistent with the requirement.
7)Check if the installation and place of water flow
switch is consistent with the requirement.