Chapter Ⅱ Installation(1.Installation Flow Chart)
6
Chapter Ⅱ Installation
1.Installation Flow Chart
Submit the design draft
Selection of material
Examine and verify the on-site installation position
Install water tank Install outdoor unit
Install water-side pipelines
and valves
Heat insulation
connect water tank and outdoor unit
Connect power cord and communication wire
Debugging of unit
Completion work chart
Deliver operating instruction manual
2. Preparation Before Installation
2.1 Matters Need Attention During Installation
2.1.1 Safety requirements for installation and construction
Warning! Before construction, all the constructors must have had the safety education
and have passed the safety examination. Once there is violating behavior, the constructor should
bear related liabilities.