INSTALLATION
PAGE 7
ENGLISH
Illustration 6
It becomes
high midway.
Thegap with the
ground is too small
Thereisthe bad
smellfrom a sewer
It waves.
Theend is imm-
ersed in water.
Lessthan
5cm
piping hole. Use a sealant to seal the piping hole opening
(Illustration 6)
Verify the condensate drain line has a constant pitch
Step 6 - Charging
See Steps 5.2 - 5.5 for evacuating the system prior to
charging. The standard lineset length is 25ft. If the installation
for the 9K, 12K, 18K, and 24K model. (Step 4 - Illustration 4)
through the instruction manual.
GWP* value: 1975
product charging port (e.g. onto the inside of the stop valve
cover).
Kyoto Protocol
B - factory refrigerant charge of the product: see unit name
plate
D - total refrigerant charge
F - refrigerant cylinder and manifold for charging
Refrigerant Charge Label
System Test
Check Items for Test Run
1
1+2=
oz
R410A
2
oz
2=
1=
B
C
D
FE
oz
A
Contains fluorinated greenhouse gases
covered by the Kyoto Protocol
Put check mark
No gas leak from linesets?
Are the linesets insulated properly?
Is condensate draining correctly?
Is the ground wire securely connected? Is the indoor unit
Is power source voltage correct according to local code?
Is there any noise?
Is the lamp normally lighting?
Are cooling and heating (when in heat pump) performing
normally?
Is the operation of room temperature sensor normal?