Preventive Maintenance Program
12 809490 Instruction Manual XPR
Cleaning and inspection schedule
This is a daily, weekly, and monthly schedule for cleaning and inspections. The PMP has instructions
for each task. These instructions help your personnel understand what to do and what to look for
during each task. In general, an operator can do the daily and weekly tasks, while maintenance
personnel usually do the monthly tasks.
A monthly maintenance log is in the back of this manual. You can make photocopies of the
maintenance log to record tasks.
Table 1
Maintenance task or activity Daily Weekly Monthly
Every
6months
Do a test of the inlet pressures X
Examine all of the air filters X
Do a check of the coolant level and condition X
Examine and lubricate O-rings X
Examine the water tube and torch X
Examine hoses, cables, and leads X
Do tests for gas leaks X
Do a check of the coolant flow X
Clean inside the plasma power supply X
Examine the contactors X
Examine the pilot arc relay X
Examine the coolant system X
Do the coolant flow test X
Examine the gas line connections X
Examine the hoses X
Examine the cables X
Examine the ground connections X
Examine the table-to-workpiece connection X
Replace the coolant and coolant filter, and clean
and examine the pump screen
X

Table of Contents

Other manuals for Hypertherm XPR170

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hypertherm XPR170 and is the answer not in the manual?

Hypertherm XPR170 Specifications

General IconGeneral
BrandHypertherm
ModelXPR170
CategoryWelding System
LanguageEnglish

Related product manuals