EasyManuals Logo
Home>IBM>Computer Hardware>Power System S914

IBM Power System S914 User Manual

IBM Power System S914
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #24 background imageLoading...
Page #24 background image
Item Description
F Outer cable management arm tab
Figure 8. Relative positions of the parts of the cable-management arm before assembly
2. The cable-management arm can be installed on either side of the server. For this procedure, it is
illustrated that you are installing it on the right side, while you are facing the server from the rear. If
you want to install the cable management arm on the other side of the rack, you can press the button
on the extension tab (1) so that it swivels in the opposite direction (2).
10
Power Systems: Installing the IBM Power System S914 (9009-42A)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Power System S914 and is the answer not in the manual?

IBM Power System S914 Specifications

General IconGeneral
BrandIBM
ModelPower System S914
CategoryComputer Hardware
LanguageEnglish

Related product manuals