EasyManuals Logo
Home>IDEAL>Boiler>isar HE24

IDEAL isar HE24 User Manual

IDEAL isar HE24
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #44 background imageLoading...
Page #44 background image
44
SERVICING
isar - Installation and Servicing
61
BURNER REPLACEMENT
1. Refer to Frame 57.
2. Remove the boiler front and sealing panels. Refer to
Frames 49 & 50.
3. Remove the fan assembly. Refer to Frame 59.
4. Remove the 6 screws securing the burner (the 3 screws at
the rear are extended to ease access).
5. Lift off the burner from the combustion chamber.
6. Fit the new burner, replacing any damaged or deteriorating
sealing gasket.
7. Reassemble in reverse order.
8. Check the operation of the boiler. Refer to Frame 57.
Note. Take care not to disturb the ionisation probes at the
front and rear of the combustion chamber.
60
BURNER INJECTOR REPLACEMENT
1. Refer to Frame 57.
2. Remove the boiler front and sealing panels. Refer to Frames
49 & 50.
3. Disconnect the electrical leads from the fan.
4. Undo the gas pipe union connection to the injector housing.
5. Remove the screw retaining the fan mounting bracket.
6. Remove the fan and venturi assembly
7. Remove the 2 injector housing screws.
8. Withdraw the injector housing.
9. Fit the new injector housing complete with injector.
10. Reassemble in reverse order, ensuring that the new gas seal
supplied is located correctly in the injector housing.
11. Check operation of the boiler. Refer to Frame 57.
Mounting bracket
7
Ecl 2400
5
Injector
Fan
Gas pipe union
62
CONTROL THERMISTOR, RETURN THERMISTOR & OVERHEAT ‘STAT REPLACEMENT
1. Refer to Frame 57.
2. Remove the boiler front and sealing panels.
Refer to Frames 49 & 50.
3. Unclip the thermistor / thermostat from the flow / return pipe and
withdraw it from the controls compartment.
4. Disconnect the electrical leads from the
thermistor / thermostat.
5. Reconnect the electrical leads and
reassemble in reverse order, ensuring that the
spring clip is securely on the pipe.
6. Check the operation of the boiler. Refer to
Frame 57.
nm7402
Ionisation
Probes
4
5
6
SERVICING
203319-3.pmd 27/03/2008, 08:1544

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL isar HE24 and is the answer not in the manual?

IDEAL isar HE24 Specifications

General IconGeneral
BrandIDEAL
Modelisar HE24
CategoryBoiler
LanguageEnglish

Related product manuals