‑36‑
5 Operation and Maintenance
5.1 Start and Stop
After programming the PLC, follow the steps below to start and stop it.
The PLC is programmed when it is in STOP state. To start PLC:
1. Set the system to RUN state.
Check that the RUN indicator is solid ON in yellow green.
2. To stop the PLC, set the system to STOP state. Alternatively, you can stop it in the
software tool of the host controller.