Maintenance
106
8. MAINTENANCE
● Maintenance must be performed according to designated maintenance
methods.
● Maintenance, inspection and replacement of parts must be performed only
by authorized personnel.
● After turning off the main circuit power supply, waiting for 10 minutes before
performance maintenance or inspection.
● DO NOT directly touch components or devices of PCB board. Otherwise
inverter can be damaged by electrostatic.
● After maintenance, all screws must be tightened.
8.1 Daily Maintenance
In order to prevent the fault of inverter to make it operate smoothly in high-performance
for a long time, user must inspect the inverter periodically (within half year). The following
table indicates the inspection content.
Main inspections Criteria
Items to be hecked
Inspection
content
Frequency Means/methods
Operation
environment
temperature, ⑴
humidity
dust, vapor, ⑵
leakage
gases ⑶
point ⑴
thermometer,
hygrometer
observation ⑵
visual ⑶
examination and
smelling
ambient temperature ⑴
shall be lower than
40 , otherwise, the ℃
rated values should be
decreased. Humidity
shall meet the
requirement
no dust accumulation, ⑵
no traces of water
leakage and no
condensate.
no abnormal color ⑶
and smell.
WARNING