8 Please see operator manual for full details.
Lifting Points
Fig 4
Operation
Lifting the Machine
99 9831/2900-1 99
7. Check that the lifting eye is positioned directly above the machine centre of gravity.
Figure 84.
D
A
B
B
C
F
G
A Boom lift point B Dozer blade lift point
C Spreader bar D Centre of gravity
E Dimension= 792mm (16C-1/19C-1), 632mm
(18Z-1)
F Dimension= 639mm (16C-1/19C-1), 659mm
(18Z-1)
G Dimension= 533mm (16C-1/19C-1), 525mm
(18Z-1)
Description 18z-1 19c-1 19c-1 PC
A Boom Lift Point
B Dozer Blade Lift Point
C Spreader Bar
D Centre of Gravity
E mm 632 792 792
F mm 659 639 639
G mm 525 533 533
*COG = Centre of Gravity
The correct lifting positions are identified on the machine by their labels:
Lifting point
Position label.
Fig 5
REFER TO OPERATORS MANUAL TRANSPORTING MACHINE