Section 3-2 - Routine Maintenance
Service Schedules - Machines with SD and SF Engines
Pre-start Cold Checks, Service Points and Fluid Levels
3-2-6 3-2-6
9803/3750-05 (3-20-00)
(9) After a hub repair, the new oil should be run to operating temperature and changed again to remove any contamination
which entered during the repair. Change the oil after a further 100 hours to remove any bedding-in wear. This is
particularly important if new brake plates have been fitted.
(10) The axles and driveshafts are factory greased with a high performance grease, if during service a standard grease is
used, then the interval must be reduced to every 50 hours, contact your JCB Distributor for advice.
(11) An additional canister filter is fitted to machines with the variable flow pump option. You must change both filters at the
intervals shown in the Service Schedule.
(12) If operating under arduous conditions, check the boom wear pads every 250 hours.
ProCarManuals.com