Page #71 background imageLoading...
Page #71 background image
72 FTx/ITx-SH-e-0720
8.6.3 Attaching the weighing platform to the terminal
Before assembling, the terminal must first be discon-
nected from the power supply!
Undo the gland nut of the heavy gauge cable gland and
remove this together with the black crimping ferrule and the
two washers.
Undo the rear cover plate of the terminal (6 Torx T20
screws) and fold down carefully (cable connections!).
Mount the nut, crimping ferrule and the washer with the
larger hole on the connecting cable of the weighing
platform. Flange the shield of the cable slightly and place
the second washer over it. Insert the cable through the
heavy gauge cable gland of the terminal.
Remove the green plug from the terminal. The plug
connector is fitted with a latch to simplify plugging in and
out. The diagram opposite shows the position of the
connector in the terminal.
Remove the insulation as shown on the left.
Note: For connecting to the analog option, only 100 mm
of cable insulation should be removed.
15mm
135mm
5mm
8.6.2 Preparing the connecting cable for the weighing platform

Table of Contents

Other manuals for KERN FTC

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KERN FTC and is the answer not in the manual?

KERN FTC Specifications

General IconGeneral
BrandKERN
ModelFTC
CategoryScales
LanguageEnglish

Related product manuals