24 690 07 Rev. HKohlerEngines.com32
Lubrication System
Installation
1. Apply pipe sealant with Teon
®
(Loctite
®
PST
®
592™
Thread Sealant or equivalent) to threads of switch.
2. Install switch into tapped hole in breather cover.
3. Torque switch to 4.5 N·m (40 in. lb.).
Testing
Compressed air, a pressure regulator, pressure gauge,
and a continuity tester are required to test switch.
1. Connect continuity tester across blade terminal and
metal case of switch. With 0 psi pressure applied to
switch, tester should indicate continuity (switch
closed).
2. Gradually increase pressure to switch. As pressure
increases through range of 3-5 psi tester should
indicate a change to no continuity (switch open).
Switch should remain open as pressure is increased
to 90 psi maximum.
3. Gradually decrease pressure through range of 3-5
psi. Tester should indicate a change to continuity
(switch closed) down to 0 psi.
4. Replace switch if it does not operate as specied.