7 Commissioning
Before switching on
EDK82ZAFSC DE/EN/FR 5.0
40
H1inbet−bevor
7 Commissioning
Before switching on
Note!
ƒ If you carry out the commissioning with a configuration different from the
Lenze setting, read the instructions on "Individual Settings" (42).
ƒ Make sure
– that you have correctly set the setpoint range with the DIP switch on
the function module (41).
– that C0034 is adjusted to the settings of the DIP switch (41).
Example: setpoint selection (0 V ... +5 V) via potentiometer at X3/7,
X3/8 and X3/9
ð C0034 = 0, DIP switch 1, 2, 4 and 5 = OFF, 3 = ON