DMS 1.3 EN - 02/2011 L 41
Control technology| System manual
Commissioning of the system
General commissioning steps
5 Commissioning of the system
5.1 General commissioning steps
This chapter informs you about the basic steps to commission a control system. The over-
view in table form shows the order of commissioning steps.
Detailed information about the single commissioning steps...
... with CANopen can be found in the "CANopen control technology" commu-
nication manual.
... with EtherCAT can be found in the "EtherCAT control technology"
communication manual.
Commissioning step Description Engineering tools
Commissioning of the Industrial PC. Establishing the general readiness
for operation of the IPC.
The general readiness for operati-
on enables the usability of the
gateway in the IPC so that the
communication with field devices
is possible via the integrated gate-
way.
Industrial PC as gateway
( 23)
Optional »Engineer« or
»WebConfig«
Planning/installation of the network
(as for example electrical wiring, set-
ting of DIP switches)
This serves to prepare the field de-
vices for communication with the
IPC and the engineering tool
which communicates via the
gateway of the IPC.
None
Project planning and commissioning
of the field devices
Using the gateway in the IPC, the
"Engineer" and "GDC" programs
can communicate with the corres-
ponding field devices and carry
out the required parameter set-
ting steps.
»Engineer«
»GDC«
Project planning of the control Creating:
the control configuration,
bus configuration,
control program
»PLC Designer«
»EtherCAT Configurator«
Creating a visualisation If the IPC is provided with a moni-
tor, a visualisation can take place
there in parallel to the control.
To create the visualisation and to
download it to the IPC, use the
program
»VisiWinNET®«
Integrated visualisation
( 21)
»VisiWinNET®«

Other manuals for Lenze L-force Controls

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lenze L-force Controls and is the answer not in the manual?

Lenze L-force Controls Specifications

General IconGeneral
BrandLenze
ModelL-force Controls
CategoryIndustrial PC
LanguageEnglish

Related product manuals