EasyManuals Logo
Home>LG>Remote Control>MultiSITE CRC1 Series

LG MultiSITE CRC1 Series Installation Manual

LG MultiSITE CRC1 Series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #19 background imageLoading...
Page #19 background image
19
Installation Manual
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
ACCESSORIES INSTALLATION
Installation Sequence
Complete the following steps (in this order)
to correctly install the ceiling mounted
motion sensor:
Install batteries.
Pair sensor with MultiSITE Controller.
Verify sensing motion.
Install sensor to ceiling surface.
Install Batteries
1. Remove mounting plate by rotating
housing counter-clockwise (Figure 13).
2. Install two AAA batteries in Sensor
Housing (Figure 14). Ensure battery
polarity is correct When batteries are first
installed, the sensor automatically goes
into pairing mode. Refer to “ZigBee Setup”
on page 28.
3. Replace mounting plate by rotating hous-
ing clockwise.
4. Proceed to Verify Sensing Motion.
Verify Sensing Motion
1. Wait three minutes for sensor to warm up.
Sensor requires a three minute warm-up
before it reporting any motion detection.
2. Wave hand or object over top area of
sensor.
3. Verify LED flashes red on sensor
(Figure 15). LED flashing red indicates
motion detected.
4. Proceed to Install Ceiling Motion Sensor.
Figure 13: Remove
Mounting Plate
Figure 14: Install
Batteries
LED
Figure 15: Flashing LED

Other manuals for LG MultiSITE CRC1 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LG MultiSITE CRC1 Series and is the answer not in the manual?

LG MultiSITE CRC1 Series Specifications

General IconGeneral
BrandLG
ModelMultiSITE CRC1 Series
CategoryRemote Control
LanguageEnglish

Related product manuals