Part Number STH025 11/16 97
Operational Checks
GENERAL
Manitowoc ice machines are factory-operated and
adjusted before shipment. Normally, new installations do
not require any adjustment.
To ensure proper operation, always follow the
Operational Checks:
• when starting the ice machine for the first time
• after a prolonged out of service period
• after cleaning and sanitizing
NOTE: Routine adjustments and maintenance procedures
are not covered by the warranty.
Important
Refrigeration compressors must be operated for a
minimum break in period of 24 hours before full ice
production will be reached.